Optimize Manufacturing Schedules. Maximize OEE.
Constraint-based resource planning designed for modern factories. Reduce setup bottlenecks, allocate technicians, and sync timelines in real-time.
Engineered for High-Mix, Low-Volume Production
CapaSolve automates the complex constraints of machine capacity, setup technician loading, and order sequences.
Visual Gantt Scheduler
Drag-and-drop process blocks across machines. Live collision alerts prevent double-booking.
Performance & OEE Analytics
Track setup vs machining times. Identify workstation bottlenecks before they stall production.
Daily Capacity Planner
Set hourly limits on operator availability. Automatically load-balance shifts.
Neon Cloud Sync
Safeguard scheduling states. Save, load, and share production plans across workstations.
Role-Based Access Control
Segregate accounts. Developers modify plans, admins manage billing/team, and guests view read-only charts.
Instant CSV/Excel Processing
Directly import standard process sheets. Confirmed formulas compute durations instantly.
Calculate Your ROI with CapaSolve
Input your factory size to estimate potential time savings and annual financial impact.
* Estimates are based on average customer metrics: $50/hour internal overhead rate and 30% planning efficiency gains.
Ready to eliminate scheduling bottlenecks?
Create a free trial account, select your role (Admin or Developer), and begin optimizing your timelines in under 5 minutes.